Bill 87 adds acquisition and development powers to the Ministère de l’Économie et de l’Innovation, revises governance rules for the Société du parc industriel et portuaire de Bécancour (the Société), and grants the Société new tools to manage industrial land in Ville de Bécancour.
Concretely, the Minister may acquire immovables and perform construction or enhancement work (with government authorization); the Société receives an enlarged territory (including a large lot transferred to it), a statutory pre‑emptive right over certain industrial lands, the authority to fund infrastructure projects carried out by public bodies, and new rules to create and govern subsidiaries. The bill also tightens signing, quorum and reporting rules for the Société.
At a Glance
What It Does
The bill lets the Minister acquire, lease, alienate and improve immovables when useful to projects (with Government authorization) and amends the Société’s statute to add an observer to its board, expand its territory, create a statutory pre‑emptive right, allow it to assume infrastructure costs, and permit it to form subsidiaries under conditions. It transfers a ~102‑hectare lot (3 540 188) to the Société and repeals the prior Order in Council governing that lot.
Who It Affects
Directly affected parties include the Ministère de l’Économie et de l’Innovation, the Société du parc industriel et portuaire de Bécancour (and any subsidiaries it creates), private owners of industrially‑zoned land within Ville de Bécancour, the Ville de Bécancour municipal administration, and public bodies carrying out local infrastructure works.
Why It Matters
The bill centralizes acquisition and development tools at the provincial level and gives the Société a statutory pre‑emptive right and financing role, shifting how industrial land will be assembled and serviced in Bécancour. That changes negotiating dynamics for landowners, alters municipal coordination obligations, and creates new financial and oversight responsibilities for the Société and government.
More articles like this one.
A weekly email with all the latest developments on this topic.
What This Bill Actually Does
Bill 87 rewrites two related sets of powers: first, it broadens what the Minister for Economy, Innovation and Energy may do with land when it is “useful for the carrying out of projects.” With Government authorization, the Minister can buy immovables, lease or sell those properties, and carry out construction, maintenance or enhancement works on them. The bill also carves out an administrative route for these acquisitions in the government contract regulation, so that negotiated purchases for project‑use by the Ministry need not proceed through the Ministère des Transports or the Société québécoise des infrastructures.
Second, the bill modernizes the statute for the Société du parc industriel et portuaire de Bécancour. It adjusts governance (adding a non‑voting ministerial observer; changing quorum language; tightening how documents are signed and allowing internal by‑laws to authorize subdelegation) and expands the Société’s territory by replacing Schedule I to expressly include several lots and, centrally, lot 3 540 188—the ~101.97‑hectare industrial parcel the Government transfers to the Société under the Act.The most operational changes create a statutory pre‑emptive right for the Société within its territory of activity and lay out the mechanics: the Société may register a notice identifying an immovable and the intended purposes; the notice takes effect when registered and may last up to 10 years; an owner must serve a notice of intention to alienate or the proposed sale is null; the Société then has 60 days to decide to buy at the stated price and conditions, may inspect and commission studies after 48 hours’ notice, and must pay within 60 days or deposit funds with the Superior Court.
The bill also lets the Société assume, in whole or in part, costs of infrastructure projects carried out by public bodies where those projects further the Société’s mission.Finally, Bill 87 creates a controlled framework for subsidiaries: the Société may, with Government approval, form or acquire subsidiaries whose objects are limited to activities the Société itself may carry out. Subsidiaries generally have the same powers as the Société except they may not expropriate nor exercise the Société’s statutory pre‑emptive right; wholly owned subsidiaries are subject to access‑to‑documents rules and must prepare separate financial statements.
The Act also contains transitional provisions (the transfer of lot 3 540 188 and a retroactive effective date for one provision) and repeals the prior Order in Council that had placed the same lot under Société management.
The Five Things You Need to Know
The Société can register a pre‑emptive‑right notice that is valid for up to 10 years and must be published in the land register; registration amends the Société’s territory schedule.
An owner who fails to notify the Société of an intention to alienate an immovable faces a nullity if the sale proceeds without that notice; the owner’s notice must state price, conditions and purchaser identity, and include an objective valuation of any non‑monetary consideration.
After an owner’s notice of intention to alienate, the Société has 60 days to notify its decision to acquire; during that period it may request information and, after 48 hours’ notice, enter the property to conduct studies at its expense.
If the Société exercises its pre‑emptive right it must pay the owner within 60 days or deposit funds at the Superior Court; when it acquires it must compensate the party who negotiated with the owner for reasonable negotiation expenses.
Subsidiaries require Government authorization, are limited to activities the Société may lawfully carry out, and—unless wholly owned—do not get the Société’s expropriation power or statutory pre‑emptive right.
Section-by-Section Breakdown
Every bill we cover gets an analysis of its key sections.
Ministerial acquisition and improvement powers
The Act respecting the Ministère de l’Économie et de l’Innovation is amended so the Minister may, with Government authorization, acquire any immovable, lease or alienate immovables acquired for project purposes, and perform construction, maintenance or enhancement work on immovables. Practically, this gives the Ministry an explicit statutory route to hold and develop land for economic projects; the change to the government contracts regulation channels negotiated property purchases to that Ministry rather than the Transport ministry or SQI.
Board composition, quorum and conflict‑related edits
The Société must now include a non‑voting observer designated by the Minister; quorum language and conflict‑of‑interest references are adjusted. These are governance shifts that increase ministerial presence without granting a vote and refine who counts toward quorum and which corporate relationships are handled as subsidiaries versus controlled entities.
Signing authority and internal by‑laws
Section 20 now requires documents to be signed by the chair, the CEO, or an employee within limits set in the Société’s internal management by‑laws; those by‑laws may permit subdelegation and must be published in the Gazette officielle du Québec. The provision standardizes authority, allows operational flexibility through delegated signing, and creates a public transparency point for internal limits.
Statutory pre‑emptive right and exercise mechanics
The Société can register a pre‑emptive‑right notice for industrially‑zoned immovables in its territory (excluding public‑body properties). The statute prescribes notice contents, a maximum 10‑year validity, owner obligations to notify proposed alienations, a 60‑day exercise window for the Société, inspection and study rights with 48 hours’ notice, payment timelines, and rules for compensating a would‑be purchaser’s negotiation expenses. The provision also lays out interaction rules with municipal and other statutory pre‑emptive rights.
Subsidiary establishment, powers and limits
The Société may create or acquire subsidiaries with Government authorization; subsidiaries’ activities must be limited to those the Société could perform itself. Subsidiaries lack the Société’s expropriation power and pre‑emptive right; control is defined by majority voting or equity thresholds (>50%), and wholly owned subsidiaries become subject to access‑to‑documents obligations and separate financial‑statement requirements.
Territory change, lot transfer and transitional provisions
Schedule I is replaced to expand the Société’s territory and expressly add lot 3 540 188 and a specified part of lot 3 294 086; the Government transfers lot 3 540 188 to the Société by agreement and exempts that transfer from duties on immovable transfers. The prior Order in Council placing the lot under Société management is repealed; section‑specific effective dates and a retroactive effect for one provision (section 10 effective from 1 Jan 2023) are included.
This bill is one of many.
Codify tracks hundreds of bills on this topic across all five countries.
Explore this topic in Codify Search →Who Benefits and Who Bears the Cost
Every bill creates winners and losers. Here's who stands to gain and who bears the cost.
Who Benefits
- Société du parc industriel et portuaire de Bécancour — gains statutory pre‑emptive power, an enlarged territory (including lot 3 540 188), authority to fund infrastructure projects, and the legal basis to form subsidiaries, all of which strengthen its ability to assemble and service industrial land.
- Ministère de l’Économie et de l’Innovation and the provincial government — obtains a direct statutory route to acquire, develop and hold land for projects, which can accelerate provincially led economic development initiatives and bypass slower interdepartmental acquisition channels.
- Industrial developers and investors — can benefit from more coordinated land assembly, potential infrastructure cost‑sharing by the Société, and clearer territory planning in Bécancour that reduces fragmentation of developable parcels.
- Ville de Bécancour and local economic actors — stand to gain infrastructure investments and a stronger institutional partner committed to developing industrial land that can attract jobs and private capital.
Who Bears the Cost
- Private owners of industrially‑zoned land in Bécancour — face restricted sale flexibility because sales require notifying the Société and the Société can step in under pre‑emptive rights, altering sale dynamics and possibly suppressing competitive bidding.
- Potential private buyers/developers — may incur negotiation costs or lose deals if the Société exercises its pre‑emptive right (though the bill requires compensation for reasonable negotiation expenses).
- Provincial treasury and the Société — both face potential new liabilities: acquisition costs for land, capital expenditures to assume or fund infrastructure projects, and administrative costs to run subsidiary structures and comply with new reporting rules.
- Municipalities and public bodies — may be asked to coordinate with the Société or accept that the Société can assume part of infrastructure costs, blurring funding responsibilities and creating coordination and budgeting complexities.
Key Issues
The Core Tension
The central dilemma is between speeding industrial development by concentrating acquisition and financing authority in the Ministry and the Société, versus preserving property owners’ freedom to sell, municipal autonomy and robust public oversight; tools that make land assembly easier for economic policy also concentrate fiscal and acquisition power in provincial hands, creating accountability and market‑impact risks with no simple technical fix.
The bill prioritizes accelerated land assembly and state‑led project delivery but leaves several practical implementation questions open. The pre‑emptive right creates a detailed statutory process, yet its interaction with existing municipal pre‑emptive rights and cultural‑heritage protections is complex: the statute preserves priority rules but requires municipalities to inform the Société, which could lead to administrative frictions and disputes about which entity has priority in contested acquisitions.
Governance and accountability trade‑offs are also unresolved. The Minister gains a non‑voting observer seat, and the Société can create subsidiaries with Government authorization; wholly owned subsidiaries fall under access‑to‑documents rules but other subsidiaries do not automatically, creating a tiered transparency regime.
The Act requires separate financial statements for subsidiaries but leaves open how the Société’s contingent liabilities from assumed infrastructure costs will be budgeted, audited and reported at the provincial level. Finally, the bill shifts acquisition negotiations away from SQI and the transport ministry for Ministry‑led purchases, raising questions about valuation standards and market discipline when the government negotiates land purchases directly for project use.
There's more to this law than the bill.
Codify Laws traces every connection across the legislative lifecycle.